E-Mu SP1200 Specifications Page 47

  • Download
  • Add to my manuals
  • Print
  • Page
    / 288
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 46
PROPRIETARY DATA: This document contains proprietary data of ABB Inc. No disclosure, distribution (electronic or otherwise),
or other means of dissemination may be made without written permission.
3BUS 208 000 R1301 25Hardware Installation
Handling Instructions
The Scanning Platform arrives on dollies so that it can be maneuvered into place at
the mill. Use caution when rolling the platform on an uneven floor to keep from
getting the wheels stuck in a hole. If you need to lift the platform, see Figure 3-2
and make certain that you observe the following guidelines:
Attach any rigging used to the two lifting eyes on top of the platform.
Lifting forces must be spread over 75% of the platform.
Do not lift from one point.
Use a crane or hoist to move the platform (a dual pulley house crane is preferred
to prevent weight distribution problems).
Make certain that the platform is not subjected to bending and twisting forces.
Do not bump or drop the platform.
Secure the platform from movement while it is being stored.
Page view 46
1 2 ... 42 43 44 45 46 47 48 49 50 51 52 ... 287 288

Comments to this Manuals

No comments