3BUS 208 000 R130138 Hardware Installation
Figure 3-6 Platform to Pedestal Installation – Idler Side
5. Make certain that the mounting surfaces on the bottom of the platform are clean
and smooth.
6. Coat the entire surface on the bottom of the platform with a corrosion preventive
compound.
7. Thread two parallel lengths of wire over the rolls onto which the process is to
be guided. See Figure 3-7 on page 39.
These wires should be placed in the positions that are representative of the
outside edges of the process sheet.
8. Suspend a weight of approximately 5 lb. (3 kg) from each end of the wire.
The top of customer pedestals to
pass line is normally 953 mm
(37.50 in.). For standard end
column includes manufactured
plates and 6 mm (0.25 in.) extended
set screw, (both end columns).
Idler Side
Tighten this screw to 1/2 compression of lock washer. Use
1.25 in. or M30 bolt with lock washer and large flat washer (customer
supplied). Use a thread–locking compound to avoid vibration
loosening. Screw cannot be tightened hard; it is an expansion
mount.
Jack/leveling screws
Base 25 mm (1.0 in.) thick
Steel mounting plate 10
mm (0.375 in.), seating
for set screws
Teflon plate 3 mm (0.125
in.) thick
Tapped holes or
nut on backside
If tapped 1.25” holes are used
in the pedestals instead of
through holes for mounting the
platform, drill and tap 0.375 x
16 or M10 x 1.5 through to
tapped hole for set screw to
lock mounting bolt.
Thermal
Expansion Slot