3BUS 208 000 R130156 Utility Service Installation
Air Purge
The Scanning Platform is air purged to assure reliable operation in a paper mill
environment. The purge air duct is attached to the idler end column either directly
or with a flexible air hose. If a flexible air hose is used, the flexible portion of the
hose should be less that 10 ft. (3 m) to avoid a drop in pressure. See Figure 4-1.
Figure 4-1 Purge Air Duct Attachment
Note: Do not allow the weight of a heavy metal air duct to rest on the plastic
top cap. Off load the duct by means of bracing to the machine
foundation or use a flex ducting.
The source of air for air purge can be supplied by either the DC motor cooling air
or the ABB purge blower. Clean DC motor cooling air has the advantage of no
special air filter maintenance and is generally preferred when available. If the DC
motor cooling air is used, an adjustable damper is needed to reduce the air flow and
avoid excessive system pressure loss (especially when the doors are opened).
For installation of the ABB purge blower, refer to the instructions which are supplied
on the illustration drawings.
Normal applications should operate with the platform fully sealed. For high
temperature applications, a continuous air flow must be supplied through the scanner
beams to the drive end.
Idler End Column
Ty pic al
Installation
NOTE:Designed to accommodate
6” I.D. Duct